Construction of Siya Cheshman Basic Health Center
Brief Description: Construction of Siya Cheshman Basic HealthCenter which consist of main building, boundary wall, guard room, power house, male and female toilets, septic tanks, Bore well, underground water reservoir, solar energy system, garbage collection point,and landscaping work.
Client: UNHCR Afghanistan
Location: Siya Cheshman Village, Zaranj City, Nimruz Province, Afghanistan
Year: 2023
Construction of Nahr-e-Siraj Water Supply Network
Brief Description: Construction of Nahr-e-Siraj Water Supply Network which consist of Water Elevated Tank, Deep Bore Well, Guard room, Power House, Toilets, Septic Tank, Boundary Walls, Solar system in inverter and batteries, pipe network, gate valve, main hole and landscaping work
Client: UNHCR Afghanistan
Location: Nahr-e-Siraj Mena, Lashkargah City, Helmand Province, Afghanistan
Year: 2023
Construction of Sokhchala Comprehensive Health Center in Kandahar Province
Brief Description: Construction of Sokhchala Comprehensive Health Center which consist of main building, boundary wall, guard room, power house, male and female toilets, septic tanks, deep bore well, water elevate tank, solar energy system, garbage collection point, playgrounds and landscaping work
Client: UNHCR Afghanistan
Location: Sokhchala Village, Arghandab District, Kandahar Province, Afghanistan
Year: 2023
Rehabilitation of stone masonry side ditches on both sides from 0+000 to 0+700 and stone masonry drain on one side from 0+700 to 1+135 in Alokhil Olia village in District-16 of Kabul
Brief Description: Construction of 1800m long Stone masonry side ditch for Alokhil village main street in district#16 of Kabul city, The project is a cash-for-work project from the CRLP program of UNOPS in Afghanistan
Client: UNOPS
Location: District#16, Kabul, Afghanistan
Year: 2023
Water Treatment Plant for Water Supply System of Faqir Abad Village of Sarubi District, Kabul
Brief Description: Construction of a Water Treatment Plant facility that will prepare surface water to be drinkable for a solarized water supply pipe scheme that will provide safe drinking water for 1290 families of Faqir Abad village Tapa 1, 2, 3 & 4 of the village in Sarubi Bazar, Surobi district of Kabul city, the project is funded by UNICEF.
Client: UNICEF-COAR
Location: Sarobi District, Kabul, Afghanistan
Year: July 2022
Rehabilitation & Improvement of 38 water points & 6 water supply pipe networks and construction of 18 water wells in Helmand province IRC Reference#: IRC-AFG- 02219-38
Brief Description: Construction of 18 new water wells equipped with hand pumps, rehabilitation and installation of hand pumps for 38 water wells, and rehabilitation of 6 solarized water supply pipe schemes in Helmand province.
Client: IRC-Afghanistan
Location: Helmand, Afghanistan
Year: August 2023
Construction of water supply system and pipe schemes (bore well, RCC elevated reservoir, solar system, piping system network and guard room) in Khashrood district, Manzari village of Nimroze province (Lot#03)
Client: NRC-Afghanistan
Location: Khashrood district, Nimroz, Afghanistan
Year: 2023
Brief Description: Construction of a complete solarized water supply pipe scheme that has provided safe drinking for 100 families in Manzari villages of Khashrood district Nimroz Province
Construction of Office building at NCA country office in Kabul
Client: NCA-Afghanistan
Location: NCA Country Office, Kabul, Afghanistan
Year: 2022
Brief Description: Construction of the second floor of RCC building with all required finishing works and connection of the required systems with existing facilities for the NCA country office in Kabul
Water Supply System, Solar Panel, Flush Latrine Block with Septic Tank, Hand Washing Facility & Solid Waste Collection in Khan Mandozai School
Client: NRC-Afghanistan
Location: Mandozi District, Khost, Afghanistan
Year: 2022
Brief Description: Construction of Water Supply System, Solar Panel, Flush Latrine Block with Septic Tank, Hand Washing Facility & Solid Waste Collection in Khan Mandozai School in Khost province.
Solarized Water Supply System for the Sadiq Khan, Amir Khan and Wader Khan villages
Client: COAR-UNICEF
Location: Chakhansor District, Nimroz, Afghanistan
Year: 2022
Brief Description: Construction of a complete solarized water supply pipe scheme that has provided safe drinking for 192 families in the Sadiq Khan, Amir Khan and Wader Khan villages of Chakhansor district Nimroz Province, The project is funded by UNICEF.
Construction of RCC water Reservoirs in Kandahar province
Client: COAR- UNICEF
Location: Kandahar, Afghanistan
Year: 2022
Brief Description: Construction works of one ground water tank and 5 elevated water tanks in multiple districts of Kandahar province for solarized water pipe schemes in relevant villages, The project was funded by UNICEF
Wash infrastructures and medical waste management in 10 health facilities of Helmand province ( PD# IRC-AFG-KBH-02219-22)
Client: IRC-Afghanistan
Location: Helmand, Afghanistan
Year: 2022
Brief Description: Construction of standard WASH facilities and medical waste management facilities completed for 10 health facilities in different districts of Helmand province.
Construction of 2072 sets of double cabinets emergency latrines for 41 IDPs in Kabul
Client: COAR- UNICEF
Location: Kabul city, Afghanistan
Year: 2022
Brief Description: Construction works of 2072 numbers double cabinet emergency latrines for 41 IDP’s camps at multiple locations in Kabul city, The project was an emergency WASH program of UNICEF in Kabul
Construction of Medical Stock for AFGA main office in Kabul
Client: Afghan Family Guidance Association
Location: Kabul City, Afghanistan
Year: 2021
Brief Description: Construction of a standard medical stock in the AFGA main office in Kabul
Construction of boundary wall and parking area for AFGA main office in Kabul
Client: Afghan Family Guidance Association
Location: Kabul City, Afghanistan
Year: 2022
Brief Description: Security upgrading works and Construction of brick masonry boundary wall with installation of concertina wire over the boundary wall including installation of steel gates and construction of parking area at AFGA main office in Kabul.
Construction of RCC water Reservoir in Kabul and Khost provinces
Client: COAR- NCA
Location: Kabul & Khost, Afghanistan
Year: 2021
Brief Description: Construction works four ground RCC water tanks in Deh Sabz and Charasiab districts of Kabul and the construction of 3 elevated water tanks in Matoon and Mandozi districts of Khost province, the project is funded by NCA-Afghanistan
Construction works of Sarhil Marak School building
Client: SCA-Afghanistan
Location: Markaz Behsoud District, Wardak, Afghanistan
Year: 2021
Brief Description: Construction works of Sarhil Marak school building in Sarhil Marak, Markaz Behsoud District of Wardak province
Construction of water supply pipe scheme project in Kachogo village of Chak District, Wardak Province
Client: SCA-Afghanistan
Location: Wardak, Afghanistan
Year: 2021
Brief Description: Supply of construction material for Construction of ground water tank of water pipe scheme in Kachogho village
Kabul – Maidan 8Km road maintenance and completion of remaining works at Company bridge
Client: Ministry of Public Works
Location: Kabul, Afghanistan
Year: 2021
Brief Description: Basic restoration and repairing of 8km asphalt road with milling of all the surface and overlaying work of asphalt wearing course including construction of remaining works of Company bridge at 0+050 to 0+120 stations of the alignment
Fabrication and installation of signboards for main streets and sub-streets at Kabul City District 5
Client: UN-HABITAT
Location: District 5, Kabul, Afghanistan
Year: 2021
Brief Description: The project was a complete addressing system of Kabul city and was designed to be digitalized for online/Google addressing, The project was funded by UN-HABITAT with close coordination of Kabul municipality and unfortunately the partially completed project suspended due to political reasons.
University canal cleaning with a total length of 228m and retaining wall construction project (KND-CRP-32)
Client: IDLG, DMM CIP (Kandahar Municipality)
Location: Kandahar City, Afghanistan
Year: 2021
Brief Description: Cleaning of university canal and construction of retaining wall at both sides of the canal with a total length of 228m, The project is a cash-for-work project during the coronavirus crisis for the reduction of unemployment and poverty in the country, funded by World Bank
Fabrication and installation of signboards for main streets and sub-streets at Kabul City District 10
Client: UN-HABITAT & Kabul Municipality
Location: Kabul City, Afghanistan
Year: 2021
Brief Description: Implementation of a complete addressing system in Kabul city and was designed to be digitalized for online/google addressing, the project was funded by UN-HABITAT with close coordination of Kabul municipality and unfortunately the partially completed project suspended due to political reasons
Construction and Rehabilitation / Improvement of Wash Infrastructures in 5 health Facilities in Logar province
Client: IRC-Afghanistan
Location: Logar, Afghanistan
Year: 2021
Brief Description: Construction of standard WASH facilities and medical waste management facilities completed for 5 health facilities in deferent districts of Logar province under this contract, The Project is Funded by international Rescue Committee-Afghanistan
Construction and Rehabilitation / Improvement of WASH Infrastructures and Medical Waste Management Facilities in 10 Health Facilities in Paktiya Province (IRC PD# 01553)
Client: IRC-Afghanistan
Location: Paktiya, Afghanistan
Year: 2021
Brief Description: Construction of standard WASH facilities and medical waste management facilities completed for 10 health facilities in deferent districts of Paktiya province under this contract, The Project is Funded by international Rescue Committee-Afghanistan
Paktya Cricket Ground Water Distribution System and Outdoor Academy ACB/2017/-NCB/56
Client: Afghanistan Cricket Board
Location: Paktiya, Afghanistan
Year: 2017
Brief Description: Construction of a complete system of water supply for irrigation of the ground including fencing and drainage works, The project is funded by ACB
Reconstruction of Ghazni Cricket Academy. ACB/2017/-NS/53
Client: Afghanistan Cricket Board
Location: Ghazni City, Afghanistan
Year: 2017
Brief Description: Reconstruction of Ghazni outdoor cricket academy which included construction of cricket pitches, greenery works, water supply works and repairing of boundary wall works of the cricket academy
Retaining wall, Water Intake/ Irrigation structures raison houses, greenhouse, toilets building, and septic tank including all water supply systems in five separate contracts
Client: CCAP/MAIL
Location: Tarinkowt City, Urozgan, Afghanistan
Year: 2015-2017
Brief Description: Construction works of five separate projects which included construction of Retaining wall, Water Intake/ Irrigation structures, raison houses, greenhouse, toilets building, and septic tank including all water supply systems in Tarinkowt city of Urozgan province