37 NCA Office Buildign

Construction of Office building at NCA country office  in Kabul Client:  NCA-AfghanistanLocation: NCA Country Office, Kabul, AfghanistanYear: 2022 Brief Description: Construction of the second floor of RCC building with all required finishing works and connection of the required systems with existing facilities for the NCA country office in Kabul

38 NRC Manzari WS

Construction of water supply system and pipe schemes (bore well, RCC elevated reservoir, solar system, piping system network and guard room) in Khashrood district, Manzari village of Nimroze province (Lot#03) Client: NRC-AfghanistanLocation: Khashrood district, Nimroz, AfghanistanYear: 2023 Brief Description: Construction of a complete solarized water supply pipe scheme that has provided safe drinking for 100 families in Manzari villages of Khashrood district Nimroz Province

02 Ghazni Cricket Academy

Reconstruction of Ghazni Cricket Academy. ACB/2017/-NS/53 Client:  Afghanistan Cricket BoardLocation: Ghazni City, AfghanistanYear: 2017 Brief Description: Reconstruction of Ghazni outdoor cricket academy which included construction of cricket pitches, greenery works, water supply works and repairing of boundary wall works of the cricket academy

05 Kachogho WS project

Construction of water supply pipe scheme project in Kachogo village of Chak District, Wardak Province Client: SCA-AfghanistanLocation: Wardak, AfghanistanYear: 2021 Brief Description: Supply of construction material for Construction of ground water tank of water pipe scheme in Kachogho village

02 Paktya Cricket Ground WS

Paktya Cricket Ground Water Distribution System and Outdoor Academy ACB/2017/-NCB/56 Client:  Afghanistan Cricket BoardLocation: Paktiya, AfghanistanYear: 2017 Brief Description: Construction of a complete system of water supply for irrigation of the ground including fencing and drainage works, The project is funded by ACB

05 CIP University Canal Cleaning

University canal cleaning with a total length of 228m and retaining wall construction project (KND-CRP-32) Client:  IDLG, DMM CIP (Kandahar Municipality)Location: Kandahar City, AfghanistanYear: 2021 Brief Description: Cleaning of university canal and construction of retaining wall at both sides of the canal with a total length of 228m, The project is a cash-for-work project during the coronavirus crisis for the reduction of […]

05 Sarhil Marak School

Construction works of Sarhil Marak School building Client:  SCA-AfghanistanLocation: ‌Markaz Behsoud District, Wardak, AfghanistanYear: 2021 Brief Description: Construction works of Sarhil Marak school building in Sarhil Marak, Markaz Behsoud District of Wardak province

05 WR in Kabul & Khost

Construction of RCC water Reservoir in Kabul and Khost provinces Client:  COAR- NCALocation: ‌Kabul & Khost, AfghanistanYear: 2021 Brief Description: Construction works four ground RCC water tanks in Deh Sabz and Charasiab districts of Kabul and the construction of 3 elevated water tanks in Matoon and Mandozi districts of Khost province, the project is funded by NCA-Afghanistan

06 AFGA-Medical Stock

Construction of Medical Stock for AFGA main office in Kabul Client:  Afghan Family Guidance AssociationLocation: ‌Kabul City, AfghanistanYear: 2021 Brief Description: Construction of a standard medical stock in the AFGA main office in Kabul

05 Kabul-Maidan Road Project

Kabul – Maidan 8Km road maintenance and completion of remaining works at Company bridge Client:  Ministry of Public WorksLocation: ‌Kabul, AfghanistanYear: 2021 Brief Description: ‌Basic restoration and repairing of 8km asphalt road with milling of all the surface and overlaying work of asphalt wearing course including construction of remaining works of Company bridge at 0+050 to 0+120 stations of the alignment