On-Going Projects

ON-GOING

Rehabilitation of stone masonry side ditches on both sides from 0+000 to 0+700 and stone masonry drain on one side from 0+700 to 1+135 in Alokhil Olia village in District-16 of Kabul 

Brief Description: Construction of 1800m long Stone masonry side ditch for Alokhil village main street in district#16 of Kabul city, The project is a cash-for-work project from the CRLP program of UNOPS in Afghanistan  

Client: UNOPS
Location: District#16, Kabul, Afghanistan
Status: Ongoing  

Rehabilitation & Improvement of 38 water points & 6 water supply pipe networks and construction of 18 water wells in Helmand province IRC Reference#: IRC-AFG- 02219-38

Brief Description: Construction of 18 new water wells equipped with hand pumps, rehabilitation and installation of hand pumps for 38 water wells, and rehabilitation of 6 solarized water supply pipe schemes in Helmand province.

Client: IRC-Afghanistan
Location: Helmand, Afghanistan
Status: Ongoing

Water Treatment Plant for Water Supply System of Faqir Abad Village of Sarubi District, Kabul

Brief Description: Construction of a Water Treatment Plant facility that will prepare surface water to be drinkable for a solarized water supply pipe scheme that will provide safe drinking water for 1290 families of Faqir Abad village Tapa 1, 2, 3 & 4 of the village in Sarubi Bazar, Surobi district of Kabul city, The project is funded by UNICEF.

Client: UNICEF-COAR
Location: Sarobi District, Kabul, Afghanistan
Status: Ongoing